Main Menu

You are here

Page not found

Error message

The page you requested does not exist. For your convenience, a search was performed using the query public works traffic engineering article news.
Content

Search Results

  1. Signal Timing Frequently Asked Questions

    kgiles - 2017-05-17 12:34 - This site (Colorado Springs)

    does not work. Q: Why do traffic lights take so long to change? A: The length of wait at a traffic ... traffic benchmarking and reporting efforts bolstering public information and outreach activities Top Q: ... operation, call 719-385-5908. All signals within the City are maintained by the Traffic Engineering Division. ...

  2. City Engineering

    msheldon - 2016-04-18 13:58 - This site (Colorado Springs)

    A Division of Public Works The City of Colorado Springs Engineering Division provides civil ... engineering and related services for our community by building and managing the backbone of our society, ... including transportation and stormwater systems. We inspect and regulate the work of private developers who ...

  3. Pikes Peak Ave Reconstruction

    rphipps - 2018-02-13 10:46 - This site (Colorado Springs)

    Run to Printers Pkwy. (Winter 2018- Summer 2019) Traffic Impacts Vehicle Work began on Phase ... side of the work zone while one lane of traffic will be maintained in both directions at all times. ... project in September 2017. The project is divided into four major phases of work. The phases of work will ...

  4. Traffic Engineering

    cos_admin - 2016-03-04 17:09 - This site (Colorado Springs)

    Traffic Engineering- A Division of Public Works The Transportation/Traffic Engineering Division is ... control to ensure traffic safety and efficiency. Transportation/Traffic Engineering consists of four ...    (719) 385-6720  E-mail Address: TrafficEng@springsgov.com ENGINEERING CRITERIA MANUAL, adopted ...

  5. Neighborhood Traffic Calming

    kgiles - 2017-11-22 09:32 - This site (Colorado Springs)

    Neighborhood Traffic Management Program Are speeding, cut-through traffic, and/or traffic ... accidents a problem in your neighborhood?  The Neighborhood Traffic Management team can determine ... if a traffic study is needed. Your neighborhood may qualify if: Traffic volumes exceed 45% of typical ...

  6. Major traffic shift at Woodmen Rd/Union Blvd intersection postponed until Dec. 10

    amatkovich - 2017-12-01 08:50 - This site (Colorado Springs)

    be performing storm drain, flatwork and wall work on Woodmen Road that will require multiple traffic shifts ... Final roadway work in advance of transition to cause single lane closures this weekend COLORADO ... SPRINGS, Colo.—A major traffic shift at Woodmen Road and Union Boulevard originally scheduled to take place ...

  7. Ride On Research

    amatkovich - 2017-05-17 09:52 - This site (Colorado Springs)

    Public Input, Traffic Data Contribute to Decision COLORADO SPRINGS, Colo – The City announced today ... to reflect vehicle travel. In an effort to manage traffic speeds on Research Parkway, the Traffic Engineering ... project is to assess public sentiment as well as vehicle and bicycle traffic impacts,” said Mayor John ...

  8. Right of Way Permits and Inspections

    JHein - 2017-11-05 21:15 - This site (Colorado Springs)

      NOTE:   Contractors performing excavation or concrete work in the public right-of-way are required ... for concrete and traffic control and 2-3 working days for excavation. Once your permit is approved and ready ... Concrete, Excavation and Traffic Control Attention Contractors! Beginning Monday, Nov. 6, the City ...

  9. REMINDER: Public invited to third Old/Near North End transportation study meeting Thursday

    sleonard - 2018-01-16 10:23 - This site (Colorado Springs)

    and discuss options based on resident input and engineering best practices that could be implemented to create ... a more pleasant residential neighborhood while accommodating existing and future traffic. WHAT:           ...

  10. Woodmen Road Phase 2 Traffic Update Traffic Restrictions Lifted for most of Union Boulevard and Woodmen Road

    sleonard - 2017-12-21 15:53 - This site (Colorado Springs)

    should expect future work in the turn lanes to impact traffic as early as Jan. 2. To make a left turn ... most traffic restrictions are being lifted, work is still continuing on the project. Daily single-lane ... COLORADO SPRINGS, Colo. – Crews removed today most of the traffic restrictions on Union Boulevard ...

Pages