Site Accessibility Evaluation
Title II (Public Services: State and Local Government)
FOR RECORD:
FROM: Robert L. Hernandez, Title II ADA/Section 504 – Manager
DATE: 02/21/2025
SUBJECT: Centennial Park Self-Evaluation
1. On 09/20/2021, Title II ADA / Section 504 Coordinator(s) from the Office of Accessibility performed a Title II - Americans with Disabilities Act (ADA) Self-Evaluation. This evaluation was performed in accordance with 1991/2010 ADA Standards for Accessible Design.
2. Priorities for removing barriers are assigned in accordance with the ADA Checklist for Existing Facilities, promulgated by the ADA National Network. The checklist follows the four priorities listed in the Department of Justice ADA Title III regulations. These priorities are equally applicable to state and local government facilities:
Priority 1 - Accessible approach and entrance
Priority 2 - Access to goods and services
Priority 3 - Access to public toilet rooms
Priority 4 - Access to other items such as water fountains and public telephones
3. Corrective actions to findings were / will be submitted to the City maintenance work request system and will be managed in accordance with the City Transition Plan. Note: Recommended corrections may be modified where appropriate. Corrections are developed in consideration of the “Program Access” provisions of Title II, where applicable.
4. A copy of this report will be maintained by the Office of Accessibility. Updates to the findings included in this report will be available at the following link: https://access6.bluedag.com/access/barriers/GfhHF91nlvMItTaD4rVzj85XBKNZxywJ. Alternatively, this link is available from the Office of Accessibility’s webpage on the City of Colorado Springs website.
City of Colorado Springs Title II ADA/Section 504 – Manager
30 S. Nevada Ave, Suite 301
Colorado Springs, CO 80903
ADACompliance@coloradosprings.gov
Atch 1. City of Colorado Springs, ADA Self-Evaluation Report
Sincerely,
Robert Hernandez
Table of Contents
Findings
Accessible Routes
BFID: 191947
Surface cross slopes shall not exceed one unit vertical in 48 units horizontal (2-percent slope). When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp.
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.
BFID: 188516
The surface of the pedestrian access route has vertical discontinuities greater than 1/2 inch or between 1/4 inch and 1/2 inch that are not beveled.
Vertical surface discontinuities shall be 13 mm (0.5 in) maximum. Vertical surface discontinuities between 6.4 mm (0.25 in) and 13 mm (0.5 in) shall be beveled with a slope not steeper than 50 percent. The bevel shall be applied across the entire vertical surface discontinuity.Advisory R302.7.2 Vertical Surface Discontinuities. The allowance for vertical surface discontinuities is for occasional expansion joints and objects such as utility covers, vault frames, and gratings that cannot be located in another portion of the sidewalk outside the pedestrian access route. However, objects such as utility covers, vault frames, and gratings should not be located on curb ramp runs, blended transitions, turning spaces, or gutter areas within the pedestrian access route. This may not always be possible in alterations, but should be avoided wherever possible. Vertical surface discontinuities between unit pavers should be minimized.
BFID: 188517
Any obstruction that overhangs a route of travel must be a minimum of 80 inches above the walking surface as measured from the bottom of the obstruction.
Vertical clearance shall be 80 inches (2030 mm) high minimum. Guardrails or other barriers shall be provided where the vertical clearance is less than 80 inches (2030 mm) high. The leading edge of such guardrail or barrier shall be located 27 inches (685 mm) maximum above the finish floor or ground.