Site Accessibility Evaluation

Americans with Disabilities Act
Title II (Public Services: State and Local Government)
Evaluation PU19-0047 Cover Photo
Memorial Park - Skatepark
1315 E Pikes Peak Ave
Colorado Springs, CO 80909
Accessibility Evaluation
Inspection Date: 03/12/2020
Inspectors: Robert Hernandez
Prepared By
City of Colorado Springs Logo
City of Colorado Springs
(719) 385 - 5175
https://coloradosprings.gov/
Report Date: 01/23/2025

FOR RECORD:

FROM: Robert L. Hernandez, Title II ADA/Section 504 – Manager

DATE: 01/23/2025

SUBJECT: Memorial Park - Skatepark Self-Evaluation

1. On 03/12/2020, Title II ADA / Section 504 Coordinator(s) from the Office of Accessibility performed a Title II - Americans with Disabilities Act (ADA) Self-Evaluation. This evaluation was performed in accordance with 1991/2010 ADA Standards for Accessible Design.

2. Priorities for removing barriers are assigned in accordance with the ADA Checklist for Existing Facilities, promulgated by the ADA National Network. The checklist follows the four priorities listed in the Department of Justice ADA Title III regulations. These priorities are equally applicable to state and local government facilities:

Priority 1 - Accessible approach and entrance
Priority 2 - Access to goods and services
Priority 3 - Access to public toilet rooms
Priority 4 - Access to other items such as water fountains and public telephones

3. Corrective actions to findings were / will be submitted to the City maintenance work request system and will be managed in accordance with the City Transition Plan. Note: Recommended corrections may be modified where appropriate. Corrections are developed in consideration of the “Program Access” provisions of Title II, where applicable.

4. A copy of this report will be maintained by the Office of Accessibility. Updates to the findings included in this report will be available at the following link: https://access6.bluedag.com/access/barriers/GfhHF91nlvMItTaD4rVzj85XBKNZxywJ. Alternatively, this link is available from the Office of Accessibility’s webpage on the City of Colorado Springs website.


City of Colorado Springs Title II ADA/Section 504 – Manager
30 S. Nevada Ave, Suite 301
Colorado Springs, CO 80903
ADACompliance@coloradosprings.gov


Atch 1. City of Colorado Springs, ADA Self-Evaluation Report

Sincerely,


Robert Hernandez

Table of Contents

Findings

Parking

BFID: 187671

The access aisle contains abrupt edges and surface irregularities over a 1/4 inches.
Citation:
2010 ADAS Section 502.4
Parking spaces and access aisles serving them shall comply with 302. Access aisles shall be at the same level as the parking spaces they serve. Changes in level are not permitted.

Recommendation:
Remove and replace pavement.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of gap in surface of access aisle
Image that depicts the citation requirements of the code or standard

BFID: 187672

The cross slope (short dimension) of the access aisle exceeds 2%.
Citation:
2010 ADAS Section 502.4
Parking spaces and access aisles serving them shall comply with 302. Access aisles shall be at the same level as the parking spaces they serve. Changes in level are not permitted.

Recommendation:
Remove and replace the asphalt to provide maximum 2% slope in all directions in the access aisle and accessible parking space.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of access aisle with excessive cross slope
Image that depicts the citation requirements of the code or standard

BFID: 187673

The surface of the pedestrian access route has openings greater than 1/2 inch.
Citation:
2011 PROWAG Section R302.7.3
Horizontal openings in gratings and joints shall not permit passage of a sphere more than 13 mm (0.5 in) in diameter. Elongated openings in gratings shall be placed so that the long dimension is perpendicular to the dominant direction of travel.

Recommendation:
Clean out and fill the gap.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of gap in asphalt
Image that depicts the citation requirements of the code or standard

Accessible Routes

BFID: 187650

The branches extends down too close to the route of travel.

Any obstruction that overhangs a route of travel must be a minimum of 80 inches above the walking surface as measured from the bottom of the obstruction.
Citation:
2010 ADAS Section 307.4
Vertical clearance shall be 80 inches (2030 mm) high minimum. Guardrails or other barriers shall be provided where the vertical clearance is less than 80 inches (2030 mm) high. The leading edge of such guardrail or barrier shall be located 27 inches (685 mm) maximum above the finish floor or ground.

Recommendation:
Keep the tree branches trimmed at least 80" above the sidewalk.
Barrier Priority:
Moderate (3): Should be completed as soon as possible, but there may be other items that will provide greater access to persons with disabilities. (Includes findings that have a high financial impact on the entity in relationship to the degree of access provided)
Department:
Parks & Recreation
Image of vegetation obstructing the sidewalk
Image that depicts the citation requirements of the code or standard

BFID: 187651

The accessible route on the site contains running slopes greater than 5% and has not been constructed as a ramp (i.e. handrails, wheel guides, etc.).
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Remove and replace to provide maximum 5% running slope to the porta-potty, while providing a level landing at the porta-potty entrance.
Barrier Priority:
Moderate (3): Should be completed as soon as possible, but there may be other items that will provide greater access to persons with disabilities. (Includes findings that have a high financial impact on the entity in relationship to the degree of access provided)
Department:
Parks & Recreation
Image of sidewalk with excessive running slope
Image that depicts the citation requirements of the code or standard

BFID: 187661

The cross slope of pedestrian access routes shall be 2 percent maximum. This sidewalk is near the accessible parking and porta-potty.

The panel where the sidewalk intersects from the porta-potty has a 5.9% running/cross slope.
Citation:
2011 PROWAG Section R302.6
Except as provided in R302.6.1 and R302.6.2 (Pedestrian Street Crossings Without Yield or Stop Control and Midblock Pedestrian Street Crossings), the cross slope of pedestrian access routes shall be 2 percent maximum.

Advisory R302.6 Cross Slope. The cross slope requirements in R302.6 apply to sidewalks and other pedestrian circulation paths, pedestrian street crossings and at-grade rail crossings, and pedestrian overpasses and underpasses and similar structures (see R302.2). The cross slope of the pedestrian access route is measured perpendicular to the direction of pedestrian travel. Cross slope requirements are contained in R304.5.3 for curb ramps and blended transitions, and in R407.3 for ramps.

Recommendation:
Remove and replace the sidewalk panels.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of sidewalk with excessive slopes

BFID: 187662

The old bollard base is 3" high by 6-1/2" by 5". It is a trip hazard as well as an accessibility issue.

The surface of the pedestrian access route has vertical discontinuities greater than 1/2 inch or between 1/4 inch and 1/2 inch that are not beveled.
Citation:
2011 PROWAG Section R302.7.2
Vertical surface discontinuities shall be 13 mm (0.5 in) maximum. Vertical surface discontinuities between 6.4 mm (0.25 in) and 13 mm (0.5 in) shall be beveled with a slope not steeper than 50 percent. The bevel shall be applied across the entire vertical surface discontinuity.Advisory R302.7.2 Vertical Surface Discontinuities. The allowance for vertical surface discontinuities is for occasional expansion joints and objects such as utility covers, vault frames, and gratings that cannot be located in another portion of the sidewalk outside the pedestrian access route. However, objects such as utility covers, vault frames, and gratings should not be located on curb ramp runs, blended transitions, turning spaces, or gutter areas within the pedestrian access route. This may not always be possible in alterations, but should be avoided wherever possible. Vertical surface discontinuities between unit pavers should be minimized.

Recommendation:
Remove the base and repair the hole or simply add the bollard.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of old bollard base obstructing curb ramp
Image that depicts the citation requirements of the code or standard

BFID: 187663

The landing at the top of the curb ramp has running slope and/or cross slope exceeding 2%.
Citation:
2010 ADAS Section 406.4
Landings shall be provided at the tops of curb ramps. The landing clear length shall be 36 inches (915 mm) minimum. The landing clear width shall be at least as wide as the curb ramp, excluding flared sides, leading to the landing.

Recommendation:
Remove and replace to provide a landing with maximum 2% slope in all directions.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of noncompliant upper landing

BFID: 187664

The curb ramp on the accessible route contains cross slopes greater than 2%.
Citation:
2010 ADAS Section 405.3
Cross slope of ramp runs shall not be steeper than 1:48.

2010 ADAS Section 406.1
Curb ramps on accessible routes shall comply with 406, 405.2 through 405.5, and 405.10.

Recommendation:
Remove and replace sidewalk to provide maximum 2% cross slope.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of excessive slopes

BFID: 187665

The surface of the pedestrian access route has openings greater than 1/2 inch.
Citation:
2011 PROWAG Section R302.7.3
Horizontal openings in gratings and joints shall not permit passage of a sphere more than 13 mm (0.5 in) in diameter. Elongated openings in gratings shall be placed so that the long dimension is perpendicular to the dominant direction of travel.

Recommendation:
Clean out and fill the gap.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of gap in sidewalk
Image that depicts the citation requirements of the code or standard

BFID: 187666

The accessible route on the site contains running slopes greater than 5% and has not been constructed as a ramp (i.e. handrails, wheel guides, etc.).

When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as ramp. Surface cross slopes must not exceed one unit vertical in 48 units. Horizontal (2-percent slope).
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Do nothing as this route isn't feasible to fix and there is another entrance to the porta potty which is correct.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of sidewalk with excessive slopes
Image that depicts the citation requirements of the code or standard

BFID: 187667

The accessible route on the site contains running slopes greater than 5% and has not been constructed as a ramp (i.e. handrails, wheel guides, etc.).
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Reduce the slope of the sidewalk to maximum 8.33% with handrails on each side, or to maximum 5% with no handrails.
Barrier Priority:
Important (2): Should be completed as soon as possible. (Includes findings that would remove barriers to the greatest number of people to your goods and services)
Department:
Parks & Recreation
Image of sidewalk with excessive slopes
Image that depicts the citation requirements of the code or standard
Additional Finding Photos
Image of sidewalk with excessive slopes
Finding 187667 Additional Photo

BFID: 187668

The surface of the pedestrian access route has openings greater than 1/2 inch.
Citation:
2011 PROWAG Section R302.7.3
Horizontal openings in gratings and joints shall not permit passage of a sphere more than 13 mm (0.5 in) in diameter. Elongated openings in gratings shall be placed so that the long dimension is perpendicular to the dominant direction of travel.

Recommendation:
Fill gaps
Barrier Priority:
Important (2): Should be completed as soon as possible. (Includes findings that would remove barriers to the greatest number of people to your goods and services)
Department:
Parks & Recreation
Image of noncompliant sidewalk
Image that depicts the citation requirements of the code or standard
Additional Finding Photos
Image of inaccessible sidewalk
Image of inaccessible sidewalk
Image of inaccessible sidewalk

BFID: 189915

The accessible route contains running slopes greater than 5 percent across the width of the walk and has not been constructed as a ramp (i.e. handrails, wheel guides, etc.).

When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as ramp. Surface cross slopes must not exceed one unit vertical in 48 units. Horizontal (2-percent slope).
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Do nothing. This should be marked as complaint given where it is.
Barrier Priority:
Important (2): Should be completed as soon as possible. (Includes findings that would remove barriers to the greatest number of people to your goods and services)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard
Additional Finding Photos
Finding 189915 Additional Photo
Finding 189915 Additional Photo

BFID: 187669

At least 5% of each type in each functional area of dining surfaces must be accessible and must be dispersed throughout the space or facility containing dining surfaces. An accessible table must be on an accessible route (36 inches minimum) and have knee and toe spaces at least 27 inches high, 30 inches wide and 17 inches deep. The tops of tables and counters shall be 28 inches to 34 inches from the floor or ground.
Citation:
2010 ADAS Section 226.1
Where dining surfaces are provided for the consumption of food or drink, at least 5 percent of the seating spaces and standing spaces at the dining surfaces shall comply with 902. In addition, where work surfaces are provided for use by other than employees, at least 5 percent shall comply with 902.

Recommendation:
Install an accessible picnic table, or install signage indicating the location of the closest accessible picnic table.
Barrier Priority:
Important (2): Should be completed as soon as possible. (Includes findings that would remove barriers to the greatest number of people to your goods and services)
Department:
Parks & Recreation
Image of inaccessible picnic table

BFID: 187670

The accessible route on the site contains running slopes greater than 5% and has not been constructed as a ramp (i.e. handrails, wheel guides, etc.).

There is also vertical displacement up to 1/2".
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Grind to less than 1/2". Install signage indicating the location of the accessible route.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of inaccessible sidewalk
Image that depicts the citation requirements of the code or standard
Additional Finding Photos
Image of inaccessible sidewalk

BFID: 187674

The cross slope of the pedestrian access route is excessive.
Citation:
2011 PROWAG Section R302.6
Except as provided in R302.6.1 and R302.6.2 (Pedestrian Street Crossings Without Yield or Stop Control and Midblock Pedestrian Street Crossings), the cross slope of pedestrian access routes shall be 2 percent maximum.

Advisory R302.6 Cross Slope. The cross slope requirements in R302.6 apply to sidewalks and other pedestrian circulation paths, pedestrian street crossings and at-grade rail crossings, and pedestrian overpasses and underpasses and similar structures (see R302.2). The cross slope of the pedestrian access route is measured perpendicular to the direction of pedestrian travel. Cross slope requirements are contained in R304.5.3 for curb ramps and blended transitions, and in R407.3 for ramps.

Recommendation:
Remove and replace to provide maximum 2% cross slope.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of sidewalk with excessive cross slopes
Additional Finding Photos
Image of inaccessible sidewalk