Site Accessibility Evaluation

Americans with Disabilities Act
Title II (Public Services: State and Local Government)
Evaluation PU19-0104 Cover Photo
Penrose Park
4295 Nonchalant Cir S
Colorado Springs, CO 80917
Accessibility Evaluation
Inspection Date: 11/23/2021
Inspectors: Robert Hernandez
Prepared By
City of Colorado Springs Logo
City of Colorado Springs
(719) 385 - 5175
https://coloradosprings.gov/
Report Date: 02/28/2025

FOR RECORD:

FROM: Robert L. Hernandez, Title II ADA/Section 504 – Manager

DATE: 02/28/2025

SUBJECT: Penrose Park Self-Evaluation

1. On 11/23/2021, Title II ADA / Section 504 Coordinator(s) from the Office of Accessibility performed a Title II - Americans with Disabilities Act (ADA) Self-Evaluation. This evaluation was performed in accordance with 1991/2010 ADA Standards for Accessible Design.

2. Priorities for removing barriers are assigned in accordance with the ADA Checklist for Existing Facilities, promulgated by the ADA National Network. The checklist follows the four priorities listed in the Department of Justice ADA Title III regulations. These priorities are equally applicable to state and local government facilities:

Priority 1 - Accessible approach and entrance
Priority 2 - Access to goods and services
Priority 3 - Access to public toilet rooms
Priority 4 - Access to other items such as water fountains and public telephones

3. Corrective actions to findings were / will be submitted to the City maintenance work request system and will be managed in accordance with the City Transition Plan. Note: Recommended corrections may be modified where appropriate. Corrections are developed in consideration of the “Program Access” provisions of Title II, where applicable.

4. A copy of this report will be maintained by the Office of Accessibility. Updates to the findings included in this report will be available at the following link: https://access6.bluedag.com/access/barriers/GfhHF91nlvMItTaD4rVzj85XBKNZxywJ. Alternatively, this link is available from the Office of Accessibility’s webpage on the City of Colorado Springs website.


City of Colorado Springs Title II ADA/Section 504 – Manager
30 S. Nevada Ave, Suite 301
Colorado Springs, CO 80903
ADACompliance@coloradosprings.gov


Atch 1. City of Colorado Springs, ADA Self-Evaluation Report

Sincerely,


Robert Hernandez

Findings

North Portion - Accessible Routes

BFID: 192612

The walkway contains abrupt vertical edges and/or variations over a 1/2 inch.

1/4 inch is the maximum vertical rise. Changes in level between 1/4 inch and 1/2 inch must be beveled at 1:2 or less.

Changes in level greater than 1/2 inch must be by way of a ramp.
Citation:
2010 ADAS Section 303.3
Changes in level between 1/4 inch (6.4 mm) high minimum and 1/2 inch (13 mm) high maximum shall be beveled with a slope not steeper than 1:2.

2010 ADAS Section 303.2
Changes in level of 1/4 inch (6.4 mm) high maximum shall be permitted to be vertical.

Recommendation:
Pave an accessible route to meet the elevation of the bridge. Cost estimate included in another finding.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard

BFID: 188800

There is no accessible route to the element.

At least one accessible route shall connect accessible buildings, accessible facilities, accessible elements, and accessible spaces that are on the same site.
Citation:
2015 IBC Section 1104.2
At least one accessible route shall connect accessible buildings, accessible facilities, accessible elements and accessible spaces that are on the same site.

2010 ADAS Section 206.2.2
At least one accessible route shall connect accessible buildings, accessible facilities, accessible elements, and accessible spaces that are on the same site.

Recommendation:
Pave an accessible route between park sections.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Finding 188800 Main Photo
Image that depicts the citation requirements of the code or standard
Additional Finding Photos
Gravel trail with excessive cross slope
Gravel trail with excessive cross slope
Gravel trail with excessive cross slope

BFID: 192614

The accessible route on the site has running slopes greater than 5 percent and has not been constructed as a ramp (i.e. handrails, edge protection, etc.).

When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp. Surface cross slopes must not exceed one unit vertical in 48 units horizontal (2-percent slope).
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Remove and replace at <5%.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard
Additional Finding Photos
Finding 192614 Additional Photo

BFID: 192615

The accessible path of travel has cross slopes greater than 2%.

Surface cross slopes shall not exceed one unit vertical in 48 units horizontal (2-percent slope). When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp.
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Remove and replace at <2%.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard
Additional Finding Photos
Finding 192615 Additional Photo
Finding 192615 Additional Photo

BFID: 192613

There is no accessible route to the element.

At least one accessible route shall connect accessible buildings, accessible facilities, accessible elements, and accessible spaces that are on the same site.
Citation:
2015 IBC Section 1104.2
At least one accessible route shall connect accessible buildings, accessible facilities, accessible elements and accessible spaces that are on the same site.

2010 ADAS Section 206.2.2
At least one accessible route shall connect accessible buildings, accessible facilities, accessible elements, and accessible spaces that are on the same site.

Recommendation:
Provide an accessible route to this element, reposition the element, or likely provide another trash receptacle along a nearby accessible route.
Barrier Priority:
Low (4): Should be completed as soon as possible due to being a technical violation, but may not result in providing greater access to persons with disabilities. (Includes findings that are technically violations but provide a moderate to low increase in accessibility compared to the financial impact on the entity)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard

BFID: 192791

The accessible path of travel has cross slopes greater than 2%.

Surface cross slopes shall not exceed one unit vertical in 48 units horizontal (2-percent slope). When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp.
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Remove and replace at <2%.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard
Additional Finding Photos
Finding 192791 Additional Photo
Finding 192791 Additional Photo
Finding 192791 Additional Photo

BFID: 192621

The T-shaped or circular turning space has excessive slopes.

Surface slopes greater than 1:48 (2.08%) are not permitted.
Citation:
2010 ADAS Section 304.2
Floor or ground surfaces of a turning space shall comply with 302. Changes in level are not permitted.

2010 ADAS Section 304.2 Exception
Slopes not steeper than 1:48 shall be permitted.

Recommendation:
Remove and replace at <2%.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard

BFID: 192622

The walkway contains abrupt vertical edges and/or variations over a 1/2 inch.

1/4 inch is the maximum vertical rise. Changes in level between 1/4 inch and 1/2 inch must be beveled at 1:2 or less.

Changes in level greater than 1/2 inch must be by way of a ramp.
Citation:
2010 ADAS Section 303.3
Changes in level between 1/4 inch (6.4 mm) high minimum and 1/2 inch (13 mm) high maximum shall be beveled with a slope not steeper than 1:2.

2010 ADAS Section 303.2
Changes in level of 1/4 inch (6.4 mm) high maximum shall be permitted to be vertical.

Recommendation:
This finding can be corrected when either the turning area or the pads en route to Sleepy Hollow Circle North are replaced.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard
Additional Finding Photos
Finding 192622 Additional Photo

BFID: 192623

The accessible path of travel has cross slopes greater than 2%.

Surface cross slopes shall not exceed one unit vertical in 48 units horizontal (2-percent slope). When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp.
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Remove and replace at <2%.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard

BFID: 192625

The accessible route has running slopes greater than 5% and has not been constructed as a ramp (i.e. handrails,edge protection, etc.). Cross slopes are greater than 2% across the width of the walk.

When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp. Surface cross slopes must not exceed 1 unit vertical in 48 units horizontal (2-percent slope).
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Fix this section to at or under 2% cross slope and under 5% running slope. This route is the connector to Nonchalant Dr and it also provides access to Jimmy Warren Park (not a City-owned or maintained facility), which is not currently accessible and would be extremely challenging to make accessible due to the slope of the surrounding terrain.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Finding 192625 Main Photo