In Progress

Register to receive project updates via text message:
Text SABImpacts to 844-289-1002

 

Sign up to receive project updates via email

Department:
Public Works
Spring 2020
  • Preliminary design and environmental clearances
June 2022
  • Completed design and plans
Early 2023
  • Segment 1 construction 
Late 2024
  • Segment 1 completed
Early 2026
  • Segment 2 construction

Current Traffic Impacts

Late Feb.–Late May: Work between Astrozon Boulevard and Sand Creek for a traffic switch

Be aware of upcoming lane closures on South Academy Boulevard between Astrozon Boulevard and El Morro Road near Sand Creek to prepare for traffic switch.

On Wednesday, Feb. 25 and Thursday, Feb. 26, north- and southbound left lanes will be closed from 9 a.m. to 3 p.m. while crews remove old pavement markings and install new temporary ones for a new lane configuration.

Include map: S Academy Blvd-Feb2026-Astrozon-ElMorro-lanes.jpg or link to map

Beginning at 3 p.m. on Thursday, the new lane layout will be in place. Drivers can expect lane reductions and traffic shifted to the west, with northbound lanes moving to the inside.

The ramps connecting Hancock Expressway to South Academy Boulevard are closed. Drivers will need to use the signalized intersection to make right-hand turns during construction. Plan for minor delays and watch for signs in the area for updates.

The southbound South Academy Boulevard on-ramp to eastbound Milton Proby Parkway is closed to allow crews to perform water and drainage utility upgrades in the area.

This closure will be in place approximately until the end of May. Follow posted detour signs. Drivers should slow down in school zones, and drive with care. Safety tip: Slow down, follow signs, watch for workers and equipment, and allow extra time.