2016
  • Phase 1 Construction
2021-2023
  • Phase 2 Design and Right of Way
May 2024
  • Construction Start
June-August 2024
  • Tutt Boulevard closure, Vickie Lane to Spring Breeze Drive
September 2024
  • Construction Completion

About

The project extended Tutt Boulevard from Dublin Boulevard to existing Tutt Boulevard, approximately 1,000 feet north. Phase 1 of the project, from Dublin to Vickie Lane, was completed in 2016. Phase 2, in 2024, completed the roadway, widening Tutt to two lanes in each direction, with curb, gutter, sidewalks, pedestrian ramps and storm drainage improvements from Vickie Lane northward. Significantly, it improves traffic flow by eliminating the two 90 degree turns from Tutt to Vickie Lane to Templeton Gap. 

The project is a PPRTA  A-list project approved by voters in 2012. More information on PPRTA is available on the PPRTA website.

Key Elements

  • Access to local businesses and neighborhoods maintained throughout construction
  • Traffic flow and safety improvements: Vickie Lane became a T-intersection with a stop sign at Tutt Boulevard. Tutt is now free-flowing from Dublin Boulevard northward. 
  • The main entry to Church for All Nations is now via Vista Vision Drive

Before & After Photos

Tutt Boulevard facing south before construction.
Tutt Blvd. facing south before construction.
The same section of Tutt Boulevard as from the before photo, seen from above and looking north after reopening.
The same section of roadway as from the above image, seen from above and looking north, after the road's reopening.