Quick Stats
2C Statistics for 2023 (as of September 30, 2023)
- Repaved 148 lane miles
- Replaced more than 210,820 linear feet, or 38 miles, of curb and gutter
- Replaced 635,935 square feet of sidewalk
- Installed 354 new pedestrian ramps
- Retrofitted 875 existing pedestrian ramps
2C Cumulative Statistics (as of September 30, 2023)
- Repaved 1,597 lane miles
- Replaced 1,564,715 linear feet of curb and gutter
- Replaced 3,616,838 square feet of sidewalk
- Installed 1,809 new pedestrian ramps
- Retrofitted 7,613 existing pedestrian ramps