2C2 Statistics (through Q3 2022)
- Repaved 83 lane miles
- Replaced 160,174 linear feet of curb and gutter
- Replaced 449,489 square feet of sidewalk
- Installed 181 new pedestrian ramps
- Retrofitted 649 existing pedestrian ramps
2C Cumulative Statistics
- Repaved 1,321 lane miles
- Replaced 1,343,551 linear feet of curb and gutter
- Replaced 2,921,008 square feet of sidewalk
- Installed 1,391 new pedestrian ramps
- Retrofitted 6,731 existing pedestrian ramps